Delta Boat Ramp Use During Wall Repair Trials
September 9, 2026
LRCA Submission For Wall Remediation
September 10, 20269 September 2026
BoPRC makes good progress on Ohau Wall Trial Repairs
Here is an excellent update to the Community Liaison Panel members from Andy Bruere
Principal Advisor (Lake Operations), BoPRC.
The Ohau wall construction trials are progressing well with testing the two methods of repair on small sections of the wall.
The first trial section is complete where a medium term repair method has been installed onto a section of the wall.
The next trial which will run from mid-September until mid-December, testing the long-term repair option on a section of the wall is well underway.
An informative summary report on progress along with photos is HERE to enable you to see the extent of work involved.